Profile/Personal Detail
Master of Engineering (MT) in 2013
Earth Science and Technology, Bandung Institute Of Technology
Bachelor of Science in Geology 2010
Dept. of Geology, Bandung Institute Of Technology
Employment :
I currently work in Laboratory of Engineering Geology and Department of Applied Geology, FTG Unpad. Besides, I also worked a Geologist and Geotechnical Engineer since 2014, collaborated with geotechnical and geological consultant, contractor, and owner of the company.
Research Project
Current research :
Geohazard Site Survey Bintuni Area (PT. GDA)
Previous Research and Project
- Geological Survey for The Geotechnical Investigation and Topographical Survey for Gre@T Tuban Project In East Java (PT. Soilens)
- Geological Investigation Study for PTPN 8 Cibogo Area (PT. INTI Bumi Mandiri)
- Fatigue Study of PT. Borneo Indobara (BIB)
- Hydrogeology And Geotechnic Study For “Open Pit and Extraction Study” (PT. Medco E&P)
- Installation for Validation Test dan Design Adsorben Hg, H2S dan As (PT. PGE Karaha)
- Geotechnical Hazard Assessment for Conveyor Development Project PT SCM (Zekon)
- Geotechnical Boring and Sample Analysis, Site PT Timah Belitung Timur (PT. EGS)
- Geotechnical Study for Open PIT Mining (PT MSI, PT BRIB, PT TBK)
- Geotechnical Investigation of PT Biofarma Jasinga
- Geotechnical Investigation of Steel Slag of PT KS Posco (Lapi ITB)
Professional Experiences
Area of experties | : | Engineering Geology, Limit Equilibrium (LEM) Slope Stability, Erosion on volcanic material |
Committee | : | – |
Profesional Group | : | IAGI (Ikatan Ahli Geologi Indonesia) MGTI (Masyarakat Geologi Teknik Indonesia) |
More Information
| SINTA | : | 6676956 |
| Google Scholar | : | l5v9lQoAAAAJ |
| Researchgate | : | Nur-Khoirullah |
| Scopus | : | 57209024800 |
| : | 93979565 | |
| Orchid | : | 0000-0001-5636-2105 |